
The unit is designed to mechanize the process of unloading cement from hoppers and feed it to the cement storage or consumables of the concrete mixing plant. The installation is mounted in the under rail space of the railways.
The unit consists of: helical conveyer feeder, pneumatic screw hoist SB-245, the receiving hopper, connecting nodes and elements, pneumatic nodes and nodes of the air preparation system, electrical equipment including remote control.
| Productivity of the unit, t/h, not more | 30 |
| The nominal height of delivery, m | 35 |
| Compressed air consumption (no more) m3/min | 7,2 |
| Operating pressure in the mixing chamber MPa (kgf/cm2), not more | 5 |
| Operating pressure in the pneumatic system, MPa | 0,15 |
| Installed power, kW max | 27,5 |
| Dimentions,mm: | |
| length | 4400 |
| width | 2200 |
| height | 2300 |
| The maximum penetration, m | 1,3 |
Capacity up to 40 m3 / h

Is intended for preparation of concrete mixes with dense aggregates and cement binder at a temperature
Capacity up to 150 m3/h

is intended for continuous preparation of concrete mixtures in field conditions
Capacity up to 150 m3 / h

Is intended for the production of all types of concrete according to DSTU B.V.2.7-96-2000 as the plastic ones P1 - P4 and hard and superstiff.