Modernization of the concrete mixing machinery and ДСК
We are glad to inform our customers about the development and successful introduction of concrete mixing plants of vertical (tower) type upgrades by our enterprise. These plants are the heart of any manufacturing plant such as ДСК, ЖБИ, КПД. The reconstructions of the plants in Ukraine and Russia showed the following results:
- A sharp increase of productivity while reducing the energy consumption, conservation of existing costly structural steelwork and industrial areas;
- Dosing accuracy corresponding to modern standards, total computer control of the technological process, taking into consideration the cost of materials, energy, products with the integration into accounting;
- Improvements of the working conditions and ecological compatibility of the object as a whole;
These modernization results are achieved by:
- Development of individual concrete mixing , dosing and conveying units projects;
- Manufacturing and replacement of the batching equipment (multiple size dispenser of the inert materials, dispensers of cement, water, concentrated chemical additives) and concrete mixers (rotary, planetary-rotary-shaft, and their combinations);
- The introduction of controlled screw and belt feeders, modern systems of pneumatic and electric equipment, aspiration and dust-control systems, microprocessor control system, including the inert material and ready mix moisture gauge.
A new development - СБ-248 – is introdused
Concrete mixing plant (CMP) СБ-248
Distinctive features of plant:
- СБ-248 is an undemanding and easy to use plant;
- Works reliably in all climates;
- Meets all the latest technical requirements;
- Provides maximum performance with minimum maintenance costs;
- High manufacturability;
- All dispensing equipment is certified by Gospotrebstandart in Ukraine and included in the State Register of measuring devices;
Purpose: to produce all types of concrete according to ДСТУ Б.В.2.7-96-2000 together the plastic П1 - П4, hard and superstiff.
The twin-shaft mixer with the amount of ready mixture 3 cubic meters is used. It gives the opportunity to get a homogeneous concrete mixture after only 30 seconds of mixing.
For achieving the performance of 150 cubic meters per hour the plant designed in a way that dosated inert materials, cement, water and chemical additives are located directly above the mixer, dosing occurs during the mixing and discharging of the mixture and loading of the mixer only takes from 10 to 12 seconds.